The operating system
for how you work.
Most software forces your team to adapt. We build bespoke systems that fit how your business already runs.
8
Compare 6 (last quarter)
£14,280,000
£12,750,000 (last quarter)
£342,600
Over budget across 3 packages
Certified value
- Certified
- Forecast
Valuations 11 to 14 ran ahead of forecast. Retention release on Northgate is due in 9 days.
Work packages
| Subcontractor | Package | Site | Due | Value | Status | |
|---|---|---|---|---|---|---|
MH Marcus HaleHale Groundworks |
Substructure & pilingRev C drawings issued | Northgate | Apr 2 | £184,500 | RFI open | ⋯ |
PR Priya RamanVector M&E |
Mechanical first fixLevels 3 to 6 | Harbour West | Apr 9 | £262,000 | On site | ⋯ |
TO Tomas OkaforMeridian Steel |
Structural steel frameAwaiting variation VO-14 | Bridgeway | Apr 14 | £418,700 | At risk | ⋯ |
SL Sarah LindqvistCrestline Cladding |
Façade & envelopeBenchmark panel approved | Harbour West | Apr 21 | £596,300 | On track | ⋯ |
Priority actions
See all-
›
RFI-042 overdue2 days
Pile cap detail at grid E4. Blocking Hale Groundworks.
-
›
Variation VO-14£38,200
Steel frame revision awaiting QS sign off.
-
›
Building controlApr 3
Drainage inspection booked, Northgate plots 1 to 14.
-
›
Retention release£72,400
Northgate phase 1 defects period ends in 9 days.
Northgate Quarter
Today on site
- 07:10 Induction complete, 4 new operatives
- 09:25 Rebar delivery signed in, plots 8 to 14
- 11:40 Tower crane paused, wind 38mph
3 days ahead of baseline
One system, shaped around
how your operation runs.
Whether the work happens on a construction site, a production line or a distribution floor, we assemble only the capabilities you need, built around your real workflows, your approval chains and the terminology your team already uses.
Nine disconnected tools, replaced by one system.
Quotations, orders, stock, suppliers and team communication lived in separate tools with no shared data. Reconciliation took two days. Nobody could answer a question about spend without opening four systems.
- Nine separate tools One operating system
- Two days to reconcile Real time, always current
- Approvals lost in chat Routed, tracked, audited
- Spend visible in hindsight Committed cost, live
“Reconciliation that used to take two days now happens in real time. For the first time we have complete visibility over procurement and spend.”
ODOperations Director
Sprint Drives Ltd
One system. Every place the work happens.
Ships as a web application and as native iOS and Android apps, sharing one live source of data.
-
Real time sync
Web and mobile share one source of truth, always current.
-
Approve on the move
Push notifications so orders and sign offs never wait for a desk.
-
Built for the field
Barcode scanning, photo capture and offline entry for site and warehouse teams.
Every client arrives with the same sentence. We looked everywhere and nothing off the shelf fits how we actually work.
Most firms write code. We re-engineer how you operate.
Generic software asks your business to conform to its assumptions. We start from the opposite premise. We study how the work actually moves through your sites, lines and suppliers, then build the system that fits.
We speak your operation
Work orders, variations, valuations, lead time variance, on time in full. We know what these mean and build for them.
You see it working early
We build in iterations. You review a working system in weeks, not months, and shape it as it takes form.
Built to grow
Systems that scale with your volume, sites and headcount rather than buckle under them.
We stay after launch
A continuing partnership that measures, refines and extends the system as your operation evolves.
See your operation
under full control.
Book a strategy session and we will map your workflow live, then show what measurable control looks like against your own numbers.
For construction, manufacturing and supply operations seeking measurable control.